Case studyPublished

A new practice in Aarau: IT for over 50 computers and devices

New computers, IT infrastructure and the relocation of all doctors: Elevate Systems supported the new ground-floor practice at Hausärzte Zentrum Aarau. Completed on 3 November 2026.

Original project announcement on LinkedIn ↗
Interior view of the Aarau practice project from the Elevate Systems LinkedIn post
Project photo from the original LinkedIn announcement. The project was completed on 3 November 2026.

The project at a glance

  • Customer: Hausärzte Zentrum Aarau
  • Location: Aarau, Switzerland
  • Project: New ground-floor practice and relocation from the previous site
  • Scope: More than 50 computers and devices
  • Completed: 3 November 2026

A new practice and IT environment

Hausärzte Zentrum Aarau was setting up a new ground-floor practice. It needed new computers and the IT infrastructure to support them. All doctors also had to move from the previous location to the new premises. The priority was to enable them to work with their IT in the new environment.

What Elevate Systems delivered

Elevate Systems set up the IT for the new practice. The project covered more than 50 computers and devices, together with new IT infrastructure. Alongside the setup, the team supported the relocation of all doctors from the old site to the new location.

  • IT setup for the new ground-floor practice
  • New computers and IT infrastructure for an environment with over 50 computers and devices
  • Migration of all doctors from the previous location to the new site
  • Support for their ability to work at the new location

Managing the relocation and working environment together

A practice move involves more than installing new equipment. Doctors also need to move their working environment to the new premises. Elevate Systems therefore managed the infrastructure and relocation together, with the aim of making the IT work for daily operations at the new site.

Completed on 3 November 2026

The project was completed on 3 November 2026. The new practice was equipped with its IT infrastructure and all doctors had been moved to the new location. Supporting their ability to work in the new environment was central to the project.